
I. Unique structural design
The 6Ton topkit type tower crane adopts a horizontal boom structure, which is welded from high-strength steel. Its truss-type structure greatly improves the overall rigidity while ensuring lightweight. In actual operation, the horizontal boom can effectively disperse the stress generated when lifting materials with its stable mechanical structure. Even in a strong wind environment, the swing amplitude can be controlled to a very small range to ensure the smooth and safe transportation of materials. This structural design opens up a wide operating space for material lifting. Compared with other types of booms, the horizontal boom can achieve 360-degree full rotation operation, and the coverage area is significantly increased.
As an important partner of the horizontal boom, the trolley rotation system is equipped with a high-precision drive device and guide mechanism, which gives the tower crane the ability to accurately adjust its position. Through the precise instructions of the PLC control system, the trolley can move back and forth on the boom with millimeter-level accuracy. In the construction of high-rise buildings, when materials need to be hoisted to the designated window on a specific floor, the trolley slewing system can respond quickly, accurately locate, and deliver the materials accurately, greatly improving the hoisting efficiency.
The top-mounted self-erecting design of the tower crane is one of its core advantages. The design adopts a modular assembly concept. Each component is pre-assembled in the factory. After being transported to the construction site, it can be quickly erected through simple bolt connections and hydraulic jacking systems. During the self-erecting process, the hydraulic jacking system gradually increases the height of the tower crane by gradually lifting the standard section of the tower body. Taking the construction of a super high-rise building as an example, as the floors continue to increase, the tower crane can be raised several meters per week through the self-erecting function, and continue to maintain efficient hoisting operation capabilities. The entire process does not require the assistance of large-scale lifting equipment, saving a lot of time and labor costs.
II. Efficient working performance
In terms of lifting capacity, the 6-ton top-mounted tower crane is equipped with a high-power lifting motor and an efficient reduction transmission system. The lifting mechanism adopts a dual-speed or multi-speed design. It can achieve high torque output at low speed to meet the needs of heavy-load lifting; it can improve lifting efficiency at high speed. When lifting construction steel, even steel beams as long as more than ten meters can be accurately lifted to the designated floor by the tower crane with its strong lifting capacity, providing strong support for steel structure construction. In addition, the lifting height of the tower crane can reach tens of meters, which can fully meet the needs of high-rise buildings and large-scale infrastructure construction.
The working speed design of the tower crane fully considers the balance between construction efficiency and safety. The lifting speed can be intelligently adjusted according to the weight of the material and the lifting height. When it is empty or lightly loaded, it can quickly lift the material to the required height; when it is heavily loaded, it automatically switches to low-speed mode to ensure smooth lifting. The slewing mechanism adopts variable frequency speed regulation technology, the slewing speed is stable and adjustable, and it can turn quickly and accurately during the lifting process, reducing the lifting time. The luffing mechanism adopts wire rope traction or gear rack transmission, and the luffing speed is flexible and can be adjusted according to actual operation needs. During the peak period of construction, multiple 6-ton top-mounted tower cranes work together to quickly lift a large amount of materials to each work surface, effectively ensuring the progress of construction.
III. Excellent safety guarantee
Safety is the top priority of construction. The 6-ton top-mounted tower crane incorporates a number of advanced safety technologies in the design and manufacturing process. The lifting weight limiter uses high-precision sensors and intelligent control systems to monitor the lifting weight of the tower crane in real time. Once it exceeds 90% of the rated lifting weight, the system will issue a warning signal; when the rated lifting weight is reached, an alarm will be immediately issued and the lifting action will be stopped to prevent safety accidents caused by overload. The lifting torque limiter monitors the lifting torque of the tower crane in real time by monitoring the lifting weight and working range to ensure that the tower crane works within a safe torque range. Even under complex working conditions, it can effectively avoid tipping accidents.
The height limiter adopts multiple protection mechanisms, which can not only prevent the hook from rising or falling beyond the limit position, but also trigger emergency braking through the backup limit device when the limit switch fails to avoid collision accidents. The slewing limiter combines mechanical and electronic limits to accurately limit the slewing angle of the tower crane and prevent the crane arm from colliding with buildings or other objects. In addition, the trolley rope breaking protection device can instantly lock the trolley to prevent it from sliding freely when the wire rope breaks; the anti-tipping device monitors the tilt angle of the tower crane in real time, and automatically activates the emergency braking system when it exceeds the safety threshold, providing all-round protection for the safe operation of the tower crane, allowing construction workers to work with peace of mind.
Fourth, a wide range of application scenarios
Due to its excellent performance and safety guarantee, 6-ton top-mounted tower cranes are widely used in various construction projects. In the construction of high-rise residential buildings, from the lifting of steel bars in the foundation construction stage, to the concrete laying during the main structure construction, to the transportation of materials in the decoration and renovation stage, 6-ton top-mounted tower cranes play an indispensable role. In the construction of a large residential community, multiple 6-ton top-mounted tower cranes operated simultaneously, efficiently lifting construction materials such as bricks, cement, and steel bars, greatly accelerating the construction progress and completing the project several months ahead of schedule.
In the construction of commercial complexes, facing complex building structures and a large amount of material lifting needs, the 6-ton top-mounted tower crane can easily cope with it with its flexible operating range and powerful lifting capacity. Whether it is the lifting of large glass curtain walls or the installation of electromechanical equipment, it can operate accurately to ensure the smooth progress of construction. In bridge construction, 6-ton top-mounted tower cranes can be used to lift bridge prefabricated components for precise installation. In the construction of a cross-sea bridge, the tower crane accurately lifted the bridge deck weighing several tons to the designated position, with the error controlled at the millimeter level, laying the foundation for the smooth closure of the bridge. In the construction of industrial plants, it can meet the lifting needs of large equipment and building materials. Whether it is the installation of heavy machinery or the construction of steel structure plants, the 6-ton top-mounted tower crane can complete the task excellently. Whether it is high-rise buildings in the city or infrastructure construction projects, you can see the busy figure of 6-ton top-mounted tower cranes.
V. Convenient maintenance
In order to ensure that the tower crane always maintains a good working condition, the 6-ton top-mounted tower crane is designed with full consideration of the convenience of maintenance. The layout of its various components follows the principle of ergonomics. Key parts such as the lifting mechanism, slewing mechanism, and luffing mechanism are equipped with special inspection platforms and channels for maintenance personnel to inspect and repair. Key components are made of high-quality alloy steel and wear-resistant materials. After a special heat treatment process, they have a long service life and reduce the frequency of replacement.
The lubrication points of important parts such as the lifting mechanism and slewing mechanism adopt a centralized lubrication system. The automatic lubrication pump injects lubricating oil into each lubrication point at a fixed time and in a fixed quantity, which greatly reduces the workload of manual maintenance. The electrical system adopts a modular design, and each functional module is independently packaged. Once a fault occurs, the maintenance personnel can quickly locate the faulty module through the fault diagnosis system and replace it. There is no need to conduct complex troubleshooting of the entire electrical system, which greatly shortens the maintenance time. In addition, the tower crane is also equipped with a remote monitoring system, which allows managers to view the tower crane's operating status, working parameters and other information in real time through mobile phones or computers, detect potential faults in advance, and formulate reasonable maintenance plans, further reducing maintenance costs.